Coronavirus Statutory Sick Pay Rebate Scheme

The Coronavirus Statutory Sick Pay Rebate Scheme will repay employers the SSP paid to current or former employees and will be available from 26 May 2020. See here.

The scheme covers all types of employment contracts and employers will be eligible to claim if they:

  • Are claiming for an employee who is eligible for sick pay due to coronavirus
  • Had a payroll scheme that was created and started on or before 28 February 2020
  • Had fewer than 250 employees on 28 February 2020

The repayment will cover up to 2 weeks starting from the first qualifying day of sickness, if an employee is unable to work because they either:

  • have coronavirus (COVID-19) symptoms
  • cannot work because they are self-isolating because someone they live with has symptoms
  • are shielding and have a letter from the NHS or a GP telling them to stay at home for at least 12 weeks
  • have been notified by the NHS or public health bodies that they’ve come into contact with someone with coronavirus
  • they have been notified by the NHS to self-isolate before surgery

You can claim for periods of sickness starting on or after:

  • 13 March 2020 – if your employee had coronavirus or the symptoms or is self-isolating because someone they live with has symptoms; or
  • 16 April 2020 – if your employee was shielding because of coronavirus.
  • 28 May 2020 – if your employee has been notified by the NHS or public health bodies that they’ve come into contact with someone with coronavirus
  • 26 August 2020 – if your employee has been notified by the NHS to self-isolate before surgery

Employees do not have to give you a doctor’s fit note for you to make a claim. But you can ask them to give you either:

  • an isolation note from NHS 111 – if they are self-isolating and cannot work because of coronavirus
  • the NHS or GP letter telling them to stay at home for at least 12 weeks because they’re at high risk of severe illness from coronavirus
  • the evidence from the NHS or public health body requiring them to self-isolate

You must keep the following records in relation to a claim you make under the scheme for three years:

  • The reason for the employee’s absence
  • Details of each period the employee could not work, including start and end dates
  • Details of the SSP qualifying days when the employee could not work
  • National insurance numbers for each employee you have paid SSP to

You’ll need to print or save your state aid declaration (from your claim summary) and keep this until 31 December 2024.

Related FAQs

Can furloughed workers still continue with union or non-union representation duties?

Yes, they can continue to undertake duties or activities for representative purposes. This includes individual or collective representation of their colleagues. They must not carry out any actual work or generate revenue for their employer or a linked or associated organisation.

Can I require my staff to inform me should their circumstances be such that they need to self-isolate?

Yes.

Workers (and agency workers) who are aware of the requirement to self-isolate and are due to work during their isolation period at a place other than their designated place (see below) must, as soon as reasonably practicable and in any event before they are next due to start work within the isolation period, tell their employer that they are self-isolating, and set out the start and end dates of their isolation period.

Clear communication to all workers about their obligation to do this is strongly recommended.

Should I continue to carry out housing inspections during the coronavirus outbreak?

As the pandemic progresses, more and more people will be forced to self-isolate and, inevitably, both tenants and staff will be affected. Put plans in place to mitigate the impact that this may have, particularly regarding staff shortages. The most important focus here should be communication.

The Covid-19 outbreak will affect the pace of everyday life and delays will be expected. Rather than allowing the pandemic to take over completely, it is important to maintain open communication with tenants as much as possible and inform them of any front-facing challenges that you may face.

The Protocol does envisage that delays may occur and allows for some degree of flexibility. Whilst all efforts should be made to conduct inspections where practical and possible, it should be expected by all parties that timescales will be extended during this crisis. It is fundamental, however, that all changes made to standard practice are communicated and explained to tenants to manage expectations.

Similar flexibility should be afforded to tenants. As households are required to isolate it will not always be possible to gain access to properties as would usually be expected and required. Likewise, vulnerable people will wish to protect themselves and their families and may refuse access on this basis. During this period, a degree of understanding must be exercised and concessions made.

Inspections may be delayed if anyone in the household has  symptoms. A questionnaire should be prepared for those visiting properties to assess so far as possible the risk; Personal Protective Equipment should be issued to those visiting, and government guidelines followed.

Understanding of the extent of the Covid-19 risk to BAME colleagues is evolving – what does that mean for NHS employers?

In practice this means that any risk assessment will need to be reviewed constantly and adjusted as our understanding of the nature and level of the risk grows.

Some service-providers are instigating special Oversight Groups to keep this issue under review but engagement and consultation with those affected is critical and making sure they feel confident to raise concerns and refuse to work if they believe they are not safe.

Can I ask for relief from KPIs or service credits under a contract with a public sector body if the Covid-19 outbreak means that I am having difficulty in performing it?

The Cabinet Office has published a useful Procurement Policy Note (“PPN”) on relief available to suppliers due to Covid-19 (available here). In brief, you should not be penalised by a public sector body, if, in the current circumstances, you are unable to comply (fully or partly) with your contractual obligations. Public sector bodies are expected to work with suppliers and, if appropriate, provide relief against current contractual terms. This is in order to maintain business and service continuity and avoid claims being accepted for other forms of contractual relief, such as the occurrence of a force majeure event.

The types of relief that may be available to suppliers to the public sector will depend on the existing contracts in place. Some contracts may have a payments by result mechanism, whereas others may be based on certain key performance indicators (KPIs) being met. Other contracts may not include any such mechanisms and therefore it will be a matter for discussion between suppliers and the public sector body.

The PPN provides that, rather than a supplier seeking to invoke a clause that would permit the supplier to suspend performance of its obligations (such as a force majeure clause), public sector bodies should first work with the supplier to amend or vary the contract. Any changes should be limited to the particular circumstances and considered on a case-by-case basis. Changes could include:

  • Amending the contract requirements
  • Varying timings of deliveries
  • Relaxing KPIs or service levels
  • Extending time for performance (e.g. revising a contract delivery plan), and/or
  • Preventing the public sector from exercising any rights or remedies against the supplier for non-performance (e.g. liquidated damages or termination rights).

These should only be temporary variations and the contract should return to the original terms once the impact of the Covid-19 outbreak on the contract has ended. Discussions with the public sector body about any changes that are agreed should be documented, in a variation signed by both parties.

A public sector may also need to take account of regulation 72 of the Public Contract Regulations 2015, to ensure that any changes to a contract (even of a temporary nature) do not trigger a requirement to conduct a new tender process. Whilst this may be unlikely to be the case with temporary variations, suppliers should still bear this in mind when discussing any changes to a contract with a public sector body.

If you are a supplier to a public sector body and you are currently struggling to meet your contractual obligations, we recommend that you take legal advice as to whether it might be possible to take advantage of the flexible approach that the PPN requires public sector bodies to adopt – it could be that you can avoid service credits or other financial deductions, or the need to serve formal notices such as “force majeure” or other relief notices.