Employees continue to accrue leave during furlough (whether they are on full furlough or flexible furlough) and can take leave during periods of Flexible Furlough (so long as you top the grant up to full pay for any days taken as holiday).
Government guidance has been updated to state that “Employees should not be placed on furlough for a period simply because they are on holiday for that period.” If a period of furlough happens to coincide with an employee’s holiday then you should ensure that there are business grounds to support furlough being used in that instance so that it isn’t just being used as a means to fund holiday utilisation.
Related FAQs
Where one or more of the parties is represented, responsibility for making the arrangements for the remote hearing will fall on either the applicant or the first represented party. If no party is legally represented, the court office will contact the parties to explain that the hearing will be held by telephone conference and will send them instructions on how this is to be achieved.
All remote hearings must be recorded. The responsibility for arranging the recording will be addressed on a case by case basis.
The Home Office has not stated when it will end these temporary measures, albeit it has stated that it will provide a warning. Where employers have carried out checks using the temporary measures, the Home Office has confirmed that it will require employers to carry out retrospective checks on any of the following:
- Employees who started working for you when the temporary measures were in place
- Employees who required a follow up check during the temporary measures (for example because their previous leave was coming to an end).
It is not explicit from the guidance but these retrospective checks must require you to have in your possession the physical ID in its original form. When carrying out the retrospective check, employers must record this using the following wording “the individual’s contract commenced on [insert date]. The prescribed right to work check was undertaken on [insert date] due to Covid-19.”
These further checks must be made within eight weeks of the temporary measures ending, and employers must keep records of both checks undertaken. Where the employer discovers that the employee does not have the right to work during the retrospective check they should stop employing them.
In the event that the worst happens and contractor insolvency occurs, there are a number of steps which the employer should take immediately:
- Confirm that insolvency has actually occurred and the type of insolvency (for example liquidation or adjudication) – actions taken based on rumours can have adverse consequences
- Secure the site and carry out an audit of the plant, equipment and materials present – this may extend to changing the locks on site in order to prevent overzealous contractors and sub-contractors seeking to return and take what they see as their possessions. The building contract may contain a provision that these are the employer’s property, but they can be difficult to recover if they are not within the employer’s possession – possession is 9/10ths of the law!
- Ensure that there are adequate insurance and health and safety arrangements in place for the site – these would usually be dealt with by the contractor and therefore may no longer be in place, so alternative arrangements may be required
- Ensure that any further payments to the contractor are stopped pending a more detailed review
- Consider whether any off-site materials have already been paid for and can be secured. This can however be difficult in practice where the materials are not physically within the employer’s possession
In addition, there are also a number of further actions which the employer should consider in the slightly longer term:
- Investigate the options available and ascertain the cost of completing the works to assist in deciding how best to proceed
- Consider whether termination of the contractor’s employment under the building contract is required, and if so take the necessary steps in accordance with the building contract
- Consider whether there are any bonds or guarantees in place upon which the employer can rely, and if so assess their terms as to whether and how to make a claim
- Make arrangements to complete the works – as a general rule of thumb the cost of completing the works may increase by around 30% if it is necessary to get a replacement contractor
- Consider whether direct payment to subcontractors is possible or desirable
- Although we would say this(!) we would strongly recommend taking legal advice, as insolvency and its implications are complex and it is easy to inadvertently fall foul of the various different requirements
Furlough means temporary leave of absence. There is nothing to stop an employer seeking to agree a temporary leave of absence – with or without pay – with its workforce.
This could not be forced on an employee without significant risk. Without agreement, this would need fair selection and consultation – more on that later.
In most circumstances the answer will be no. It would be an infringement of their human rights. It could also be a criminal assault.
However where there is a high risk to employees of exposure to COVID-19, such as care homes and healthcare environments, you might be able to make it a requirement of their role to have the vaccine.
First, consider whether you need to have a blanket requirement covering all employees or whether only certain groups who work in the most high risk areas require the vaccine.
You will need to do a thorough risk assessment balancing the amount that the risk of exposure would be reduced against the interference with the employee’s human rights. Consideration will need to be given as to whether insisting on the vaccine is proportionate to the risk and whether other less invasive steps could be taken instead, such as maintaining social distancing, wearing a mask, washing hands.
Any requirement for employees to be vaccinated should be communicated clearly to employees and trade unions together with a clear explanation for why it is necessary.