What are the publicity requirements for Traffic Regulation Orders?

In making a Traffic Regulation Order (“TRO”) local authorities must follow the regulations, which include provisions relating to publicity requiring publishing the notice in a local newspaper, making the orders available for public inspection at a Council’s offices (which are likely to be closed to the public during this time) and where considered appropriate, posting the notices on the streets.

In recognition of the potential difficulties with complying with the publicity requirements, the Department for Transport has issued guidance as to how a Council may still publicise a TRO. The guidance recognises that not everyone may be able to access local newspapers online and suggests that people and organisations could be adequately informed by means of letter, leaflet drops, or local radio. In respect of making the relevant document available at the Council’s offices, the guidance suggests that notices could be placed online or outside offices with brief details and including a telephone number or email to use to request a hard copy of the documents.

While the guidance is helpful, it is important to note that it is guidance only and that the regulations have not been relaxed. Authorities will still need to demonstrate that they have satisfied all of the publicity arrangements in respect of the TRO.

Related FAQs

What are the early warning signs that a contractor may be in financial difficulty?

As the project progresses, it is important to continually monitor the contractor’s performance.  Any one or more of the items below can be early warning signs that the contractor is in financial difficulty, and that further actions may be necessary:

  • Decrease in labour or contractor’s personnel on site, and/or rapid turnover of contractor’s personnel
  • Slowdown in progress on site
  • Plant, equipment or materials suddenly disappearing from site for no apparent reason – unpaid subcontractors may unilaterally decide to remove items from site regardless of their contractual rights to do so
  • An increasing number of defects and reduction in the quality of the contractor’s work
  • The contractor seeking changes in the payment arrangements, and in particular early payments
  • The contractor making spurious claims or contra charges
  • The contractor seeking assignment of its benefit of the building contract
  • Late filing of accounts by the contractor at Companies House
  • Unsatisfied court judgements against the contractor
  • Subcontractors and suppliers not being paid or being paid late
  • Rumours in the press, in the industry, on site or elsewhere regarding the solvency of the contractor
  • Unusual visits to site, for example from the contractor’s senior management or other personnel who had not previously been present or are not expected to be present
  • Increasingly aggressive behaviour by the contractor
  • The contractor’s parent company or another company within the contractor’s group displaying any of the above signs
BSA 2022 states that RP’s will have greater powers (to encourage residents to provide access and to fulfill their duties). What are these powers and when are they expected?

Residents will be obliged to:

  • Not act in a way that creates a significant risk of a building safety risk materialising
  • Not interfere with building safety equipment in the common parts
  • Comply with an Accountable Person’s request for information in relation to the assessment and management of building safety risks.

The Accountable Person then has powers in relation to these duties, including:

  • Issuing a contravention notice, requiring a resident to pay for replacement or repair of safety equipment which they have interfered with
  • Applying for court orders in certain situations
  • Requesting access at a reasonable time (in writing with at least 48 hours’ notice) to a resident’s property for the purposes of assessing or managing building safety risks, or checking compliance with the resident’s duties as above.

Secondary legislation is still awaited to bring these provisions into force, so the timing is unknown, but it will likely be within the next 12 months in line with the anticipated timetable for the remainder of the Act.

What does “Force Majeure” mean?

Crucially the phrase “force majeure” has no specific meaning in English law. As a result, there is scope for complex legal argument, including as to whether the effects of the coronavirus outbreak can amount to force majeure in the first place. If the coronavirus crisis deepens, force majeure provisions could become relevant in the following ways:

  • suppliers to your business might seek to invoke force majeure
  • you may need to invoke force majeure under your own contracts

Each of these will need careful analysis of the relevant contract against the applicable factual background. Unfortunately, the position is unlikely to be clear cut.

Should you rely upon Statutory Demands issued after 1 March to present a Winding Up petition?

No. No action need be taken in relation to the demand but we would advise against presentation of a petition based upon any Statutory Demand issued between 1 March 2020 and the end of the restrictions. As you may be aware, with Winding Up there is no requirement to issue a Statutory Demand notice before proceeding so this is unlikely to create too many issues – click here to see whether you should issue petitions on other grounds.

There is nothing to prevent statutory demands being served at this time. However, there may be limited benefit as it cannot form the basis of a future winding up petition.

How might the transition to a "new normal" impact on contracts?

The workplace will not revert to its pre-Covid-19 state overnight, with social distancing in the work place likely to remain in place for quite some time to come.

This could mean that businesses will need to think carefully about how their capacity will be impacted, and how this will affect their ability to perform contractual obligations.

For example, if a business has an outsourcing contract under which it has to perform a business process, or produce a particular output, will it be able to comply with contractual performance standards whilst social distancing is still in place? In the context of a manufacturing business, what will be the impact on production schedules and delivery dates? There might also be an impact on operating costs, for example if processes are changed and additional shifts are introduced – can these additional costs be sustained?

Businesses need to plan a safe system of work for their employees to ensure they comply with Health and Safety legislation, but they also need to consider how this will impact on their ability to perform pre-existing contractual obligations. Ultimately, contractual arrangements with customers might need to remain on a revised footing for a number of months.

Getting to a point where agreement is reached on allocation of additional costs and/or changes to key elements of a contract such as scope of work, performance standards and delivery date will require co-operation between contracting parties. Again, it is important that any variations that are agreed are recorded properly and follow the required contractual procedures.