What are the publicity requirements for Traffic Regulation Orders?

In making a Traffic Regulation Order (“TRO”) local authorities must follow the regulations, which include provisions relating to publicity requiring publishing the notice in a local newspaper, making the orders available for public inspection at a Council’s offices (which are likely to be closed to the public during this time) and where considered appropriate, posting the notices on the streets.

In recognition of the potential difficulties with complying with the publicity requirements, the Department for Transport has issued guidance as to how a Council may still publicise a TRO. The guidance recognises that not everyone may be able to access local newspapers online and suggests that people and organisations could be adequately informed by means of letter, leaflet drops, or local radio. In respect of making the relevant document available at the Council’s offices, the guidance suggests that notices could be placed online or outside offices with brief details and including a telephone number or email to use to request a hard copy of the documents.

While the guidance is helpful, it is important to note that it is guidance only and that the regulations have not been relaxed. Authorities will still need to demonstrate that they have satisfied all of the publicity arrangements in respect of the TRO.

Related FAQs

What type of bundle will be required by the COP for a remote hearing?

Physical bundles may not be regarded as safe for public health and there are obvious difficulties in providing them with the current restrictions in place. Electronic bundles should be provided in PDF format, preferably paginated, indexed and bookmarked. The bundles should only contain documents and authorities that are essential to the issues required to be decided at the remote hearing and should be filed with the court by email.

What do we do if we cannot meet the Court directions order / timetable?

An amendment to the Civil Procedure Rules’ Practice Directions has been approved by the Master of the Rolls and the Lord Chancellor on 1 April 2020, and is now Practice Direction 51ZA. This has the effect of allowing the parties to extend by prior written agreement up to a maximum of 56 days (rather than the usual 28 days detailed at CPR 3.8(4)) any rule, practice direction or order provided that any extension does not put at risk any hearing date. This Practice Direction will cease to have effect on 30 October 2020.

Additionally each regions’ Designated Civil Judge (DCJ) has issued a Covid-19 Protocol. There are some minor variations between the regions, but overall the guidance is very similar.

In Northumbria, Durham and Teesside the DCJ guidance for multi-track cases provides that “The parties are at liberty to extend, by consent, any step in the timetable up to a maximum of 90 days (as opposed to the present limit of 28 days)” and the Court does not need to be notified if the Trial date is not effected. Where Trial windows are likely to be impacted due to Covid-19 and the parties are in agreement to extending this, a letter can be sent to the Court with a draft order proposing a new timetable, including a new trial window and agreed availability within the trial window.

The same guidance also confirms that an electronic signature on all documents including witness statements and disclosure statements will suffice.

What routes of challenge are available to an insurer's rejection of my business interruption claim?

Many policies will only provide business interruption cover if it arises from property damage. The FCA has acknowledged that insurers are entitled to reject claims in relation to such policies, notwithstanding the success of the FCA’s test case in the Supreme Court, and which was generally favourable to policyholders [Insert a link here to our update on the test case]. In other cases the policy wording will be less clear and businesses may legitimately feel that their insurer is wrongly withholding payment.

One route of challenge to an insurer’s decision is via one of the well-publicised class actions. Another route of challenge is by a complaint to the Financial Ombudsman Service (FOS). This service is open to consumers and small and medium-sized businesses, ‘micro-enterprises’, charities and trusts. The service will be an attractive option for many businesses, as it is free and relatively quick (although it remains to be seen how the service keeps up with an increase in demand as a result of the pandemic). You will need to have complained to your insurer before bringing a complaint with the FOS.

Further details can be found here.

Flexible working

Many employees require flexible working now more than ever. That could be reduced hours, working from home, reduced days, etc. Be careful to act fairly when considering these requests as they can be a discrimination claim in the waiting.

A flexible working request is a request for a permanent change to the contract of employment however to encourage a greater take up during this difficult time, you can agree this on a temporary basis.

How do I guard against contractor insolvency in the construction industry?

It is almost impossible to completely guard against the risks associated with contractor insolvency, but there are some steps which can assist in mitigating and managing the risks involved.   To be in the best possible position, it is worth considering the following at the outset of any project:

  • Check the contractor’s financial position – particularly the specific company which will enter into the building contract, as the employer’s rights will be against this company rather than the business as a whole
  • Take legal advice to ensure that the building contract is properly drafted with appropriate provisions to deal with an insolvency event
  • Consider requiring a performance bond and/or parent company guarantee (each serve slightly different purposes)
  • Obtain collateral warranties from the consultants and sub-contractors involved, so that there are contractual rights against other parties if the contractor is no longer able to meet claims
  • Consider requiring retention bonds, advance payment bonds or vesting certificates if necessary
  • Project bank accounts and escrow accounts can also provide some further assurances for the parties involved