What type of bundle will be required by the COP for a remote hearing?
Physical bundles may not be regarded as safe for public health and there are obvious difficulties in providing them with the current restrictions in place. Electronic bundles should be provided in PDF format, preferably paginated, indexed and bookmarked. The bundles should only contain documents and authorities that are essential to the issues required to be decided at the remote hearing and should be filed with the court by email.
Related FAQs
The new rules for wearing face masks/face coverings in the workplace introduced on 23 September 2020 are as follows:
- Staff in retail, including shops, supermarkets and shopping centres, will now have to wear a face covering
- Staff in hospitality will now have to wear a face covering
- Guidance stating that face coverings and visors should be worn in close contact services, such as hairdressers and beauticians, will now become law
- Staff working on public transport and taxi drivers will continue to be advised to wear face coverings
You can take off your mask if:
- You who need to eat, drink, or take medication
- A police officer or other official asks you to
There are two stages:
- Stage 1 – The provision of written information to the representatives.
- Stage 2 – Consultation on the proposed redundancies “with a view to reaching agreement” about certain matters
Stage 1: Provision of information
The first stage in the collective consultation process is to provide the representatives with written information including details of the proposed redundancies (often called a section 188 letter). This information must be given to the appropriate representatives and the time limit before dismissals can take effect does not start to run until they have received it. It is this information which ‘starts the clock’.
It is possible that there will be changes to the proposals during the consultation process: indeed that is part of the reason for the process. The employer’s obligation is not just to provide the appropriate representatives with the relevant information at the start of the process. It is under a continuing obligation to provide them with information in writing about any developments during the consultation process (although later changes do not ‘restart the clock’ before dismissals can take effect).
Stage 2: Consultation on the proposed redundancies “with a view to reaching agreement” about certain matters
The consultation process must include consultation “with a view to reaching agreement with the appropriate representatives” on ways of:
- Avoiding the dismissals
- Reducing the number of employees to be dismissed
- Mitigating the consequences of the dismissals
The Act should make it easier for residents to obtain relevant information. It includes an obligation for the Principal Accountable Person to prepare a strategy for promoting the participation of residents, including the information to be provided to them and consultations about relevant decisions. The strategy must be provided to residents, and there will be provision for residents to be able to request information and copies of documents from the Principal Accountable Person. The type of information and the form in which it is to be provided will be set out in secondary legislation in due course, but the explanatory notes anticipate that it will include:
- Full current and historical fire risk assessments•Planned maintenance and repair schedules
- The outcome of building safety inspection checks
- Information on how assets in the building are managed
- Details of preventative measures
- Details of fire protection measures and the fire strategy for the building
- Information on the maintenance of fire safety systems
- Structural assessments
- Planned and historical changes to the building
The Construction Leadership Council (with backing from the Government) has issued practical guidance and draft pro-forma documents to enable all parties involved in the construction supply chain to enter into collaborative and open dialogue about applications for extensions of time and additional payment and to minimise potential disputes. The guidance can we downloaded here
The draft letters and notices included in the guidance have been prepared on the basis of the standard JCT Design and Build 2016 and NEC 3/4 Engineering and Construction Contract (Option A) and parties will need to make sure that they are completed/adjusted to comply with their own specific contracts.
The Cabinet Office has also issued a general statement calling on parties to contracts adversely affected by C-19 to act responsibly and fairly and to support national efforts to protect jobs and the economy.
No one factor will determine status and the outcomes will differ depending on the nature of the work being carried out and the business of the end user client.
When you have carried out an assessment based on the relevant factors you can either get in touch with us to discuss further, check your answers against HMRC’s CEST tool or do both before making a final determination.